Hello
I need to upgrade to PT12. I have lots of "finished" projects in 9 that clients reuse in subsequent versions so I need to be able to access these projects (using the old plug-ins). I know that that PT11 came with PT10 alongside and that was OK for the older versions. I'm reading through all the blurb for PT12 and I can't find anything to confirm this is still the case. Does anyone out there know about this.
Thanks
Garratty
I need to upgrade to PT12. I have lots of "finished" projects in 9 that clients reuse in subsequent versions so I need to be able to access these projects (using the old plug-ins). I know that that PT11 came with PT10 alongside and that was OK for the older versions. I'm reading through all the blurb for PT12 and I can't find anything to confirm this is still the case. Does anyone out there know about this.
Thanks
Garratty
Aucun commentaire:
Enregistrer un commentaire